Skip to content
· Est. MMXXI ·
A Boutique Registered Investment Adviser
Fee-Only · Fiduciary · Ponte Vedra, FL
BAFA triangle emblem
BAFAos
THE ADVISOR OPERATING SYSTEM · BAFA LABS
· PLANNING + SWARM VIEW · AUGUST MMXXVI ·
· BAFAos · THE GOVERNED LIFECYCLE · ARCHITECTURE PLATE · HYPOTHETICAL · ILLUSTRATIVE ONLY ·

The governed planning lifecycle, in eleven stages.

An operational expansion of the CFP Board’s financial planning process.

Stages VIII–IX carry the full multi-deliberation swarm. P4 stage-gating and the evidence spine wrap every transition.

— · —
← ADVISOR RE-ENTRY · XI → VIII · ON LIFE / MARKET / TAX / GOAL / POLICY SIGNALS
STAGES
· I – XI ·
The execution view.
· I ·
SCOPE & AUTHORITY

Adviser + client — CCO when required.

· II ·
SECURE INTAKE

Intake + data-governance agents.

· III ·
RECONCILE & COMPLETE

Completeness + consistency agents.

· IV ·
CLIENT BASELINE

Cash-flow, risk + profile agents.

· V ·
GOALS & PRIORITIES

Goal alignment + client confirmation.

· VI ·
CURRENT COURSE

Domain specialists + assumption critics.

· VII ·
ALTERNATIVES & SCENARIOS

Counterfactual + sensitivity agents.

· VIII ·
INDEPENDENT DELIBERATION

The specialist panel reasons separately.

· IX ·
TOURNAMENT + RED TEAM

Consensus, challenge — dissent preserved.

· X ·
PRESENT + HUMAN DECIDE

Adviser / CCO — reasoned disposition.

· XI ·
IMPLEMENT, MONITOR & RE-ENTER

Authorized action + advisor-initiated re-entry.

CFP BOARD
The seven steps, mapped.
CFP · 1
Understand the client’s circumstances
CFP · 2
Identify + select goals
CFP · 3
Analyze current course + alternatives
CFP · 4
Develop recommendations
CFP · 5
Present recommendations
CFP · 6
Implement
CFP · 7
Monitor progress + update
WHEN EACH AGENT LAYER ACTIVATES
NONE → LIGHT → MEDIUM → FULL · SHADES OF EACH LAYER’S COLOR
AGENT LAYER · STAGE →
· I ·
· II ·
· III ·
· IV ·
· V ·
· VI ·
· VII ·
· VIII ·
· IX ·
· X ·
· XI ·
Identity + data governance
Intake + reconciliation agents
Domain specialists
Scenario + counterfactual agents
Consensus + cost escalation
Tournament + red team
Fiduciary + compliance evaluators
Human adviser · CCO authority
Evidence + replay spine
Monitoring + re-entry
INSIDE STAGES VIII–IX · THE MULTI-DELIBERATION SWARM

P4 stage-gated orchestration wraps the entire sequence — any failed gate blocks, returns, or escalates.

· i ·
FRAME
Question, evidence, roles, constraints, materiality.
· ii ·
SELECT PANEL
Choose specialists, critics, models, tools, budget.
· iii ·
INDEPENDENT RUNS
No shared answer first — separate reasoning preserved.
· iv ·
P1 · CONSENSUS
Cluster outputs; measure geometric stability.
· v ·
P2 · ESCALATE / STOP
Spend more only when marginal information is worth it.
· vi ·
P3 · CORRECT
Compare against accumulated failure topology.
· vii ·
P5 · TOURNAMENT
Competing recommendations face bracketed evaluation.
· viii ·
P6 · RED TEAM
Attack claims, assumptions, tools, weak consensus.
· ix ·
DISSENT KEEPER
Retain disagreement that survives challenge.
· x ·
SYNTHESIS
Recommendation + alternatives + confidence + dissent.
· xi ·
P7 · FIDUCIARY GATE
Suitability, best interest, disclosures, materiality.
· xii ·
HUMAN DECISION
Approve, modify, reject, rework, or escalate.
LOW CONSENSUS / HIGH MATERIALITY → ADD AGENTS OR EVIDENCE · RETURN TO · ii · SELECT PANEL
CHALLENGE FAILURE AT · viii · RED TEAM → RE-DELIBERATE · RETURN TO · iii · INDEPENDENT RUNS
DECISION SURFACE + EGRESS
The reviewer sees the whole fiduciary surface — not a lonely approve button.
SUITABILITY BEST INTEREST ALTERNATIVES DISSENT MATERIALITY DISCLOSURES SENSITIVITY
AUTHENTICATED REVIEWER
Adviser or CCO, by policy — a reasoned disposition, signed.
APPROVE · MODIFY · REJECT · REQUEST REWORK · ESCALATE
DRIFT LOCK · REHASH AT EGRESS
Designed so output, evidence, client state, and reviewer bind at approval, and a changed, superseded, or unauthorized artifact at egress → ✕ blocked (DR-01 design; operating status per the Claims Register).
· AUTHORIZED OUTPUT PATH ·
DR-01 design — output, client state, decision surface, and reviewer bound; rehash at egress; allow or block; append to the replayable evidence chain (operating status per the Claims Register).
Machine proposes. Authenticated human authority decides.
Wax seal
BAFAos The eleven stages are the operational execution view — the governing professional methodology remains the CFP Board’s financial planning process. · MMXXVI ·
· PLATE NO. II · THE GOVERNED LIFECYCLE · ELEVEN STAGES, TEN LAYERS, ONE SWARM ·